Thursday, April 12, 2012

Long Beach Geophysical Survey

The Long Beach Geophysical Survey is now complete. Thank you to the City of Long Beach for their support!

Thursday, April 5, 2012

Long Beach Geophysical Survey

Friday, April 6th

The survey truck will be on Ultimo Ave. going North from 6th St. to PCH.

The survey truck will be operating from 9am-1pm.

We will update the schedule with any changes!

Wednesday, April 4, 2012

Long Beach Geophysical Survey

Thursday, April 5th

The survey truck will be on Ximeno Avenue going north from 7th Street to south of Pacific Coast Highway.

The survey truck will be operating from 9am-4pm.

We will update the blog with any changes!

Tuesday, April 3, 2012

Long Beach Geophysical Survey

Wednesday, April 4rd

The survey truck will be on Anaheim Rd going East from Belmont Ave. to PCH.

Access will be limited to residents only when truck is on the street.

The survey truck will be operating from 9am-4pm.

We will update the blog with any changes!

Monday, April 2, 2012

Long Beach Geophysical Survey

Tuesday, April 3rd

The survey truck will be on Margo Ave. going Northwest from Monita St. to 7th. St. Then on Iroquois Ave. going South from Anaheim Rd. to End of Iroquois Ave.

Access will be limited to residents only when truck is on the street.

The survey truck will be operating from 9am-4pm.

We will update the blog with any changes!

Long Beach Geophysical Survey

Monday, April 2nd

The survey truck will be on Stevely Avenue/Lees Avenue going South from Roxanne Way to 9th Street. Then on Roxanne Way going South from 9th Street to Stevely Avenue. Then on 9th Street going West from Roxanne Way to Lees Avenue.

Access will be limited to residents only when truck is on the street.

The survey truck will be operating from 9am-4pm.

We will update the blog with any changes!