Thursday, April 12, 2012

Long Beach Geophysical Survey

The Long Beach Geophysical Survey is now complete. Thank you to the City of Long Beach for their support!

Thursday, April 5, 2012

Long Beach Geophysical Survey

Friday, April 6th

The survey truck will be on Ultimo Ave. going North from 6th St. to PCH.

The survey truck will be operating from 9am-1pm.

We will update the schedule with any changes!

Wednesday, April 4, 2012

Long Beach Geophysical Survey

Thursday, April 5th

The survey truck will be on Ximeno Avenue going north from 7th Street to south of Pacific Coast Highway.

The survey truck will be operating from 9am-4pm.

We will update the blog with any changes!

Tuesday, April 3, 2012

Long Beach Geophysical Survey

Wednesday, April 4rd

The survey truck will be on Anaheim Rd going East from Belmont Ave. to PCH.

Access will be limited to residents only when truck is on the street.

The survey truck will be operating from 9am-4pm.

We will update the blog with any changes!

Monday, April 2, 2012

Long Beach Geophysical Survey

Tuesday, April 3rd

The survey truck will be on Margo Ave. going Northwest from Monita St. to 7th. St. Then on Iroquois Ave. going South from Anaheim Rd. to End of Iroquois Ave.

Access will be limited to residents only when truck is on the street.

The survey truck will be operating from 9am-4pm.

We will update the blog with any changes!

Long Beach Geophysical Survey

Monday, April 2nd

The survey truck will be on Stevely Avenue/Lees Avenue going South from Roxanne Way to 9th Street. Then on Roxanne Way going South from 9th Street to Stevely Avenue. Then on 9th Street going West from Roxanne Way to Lees Avenue.

Access will be limited to residents only when truck is on the street.

The survey truck will be operating from 9am-4pm.

We will update the blog with any changes!

Thursday, March 29, 2012

Long Beach Geophysical Survey

Friday, March 29th

The survey truck will be on De Leon Street going West from Josie Street to Palo Verde Avenue. Then on Rendina Street going East from Palo Verde Avenue to Knoxville Avenue. Then on Vuelta Grande Avenue going South from Atherton Street to Studebaker Road. Then on Driscoll Street going West from Studebaker Road to Vuelta Grande Avenue. Then on Mantova Street going East from Studebaker Road to Stevely Avenue. Then on Driscoll Street going West from west of Stevely Avenue to Studebaker Avenue.

Access will be limited to residents only when truck is on the street.

The survey truck will be operating from 9am-4pm.

We will update the blog with any changes!

Wednesday, March 28, 2012

Long Beach Geophysical Survey

Thursday, March 29th

The survey truck will be on San Vincente Avenue going South from Los Arcos Street to Stearns Street. Then on McNab Avenue going North from Stearns Street to Woodruff Avenue/405 freeway. Then on Carfax Avenue going South from Woodruff Avenue/405 freeway to Stearns Street. Then on Monrovia Avenue going South 6th Street to 4th Street. Then on 4th Street going East on Monrovia Avenue to Terraine Avenue. Then on 4th Street going East from Ultimo Avenue to Bellflower Boulevard. Then on Ultimo Avenue going North from Colorado Street to 4th Street.

Access will be limited to residents only when truck is on the street.

The survey truck will be operating from 9am-4pm.

We will update the blog with any changes!

Tuesday, March 27, 2012

Long Beach Geophysical Survey

Wednesday March 28th

The survey truck will be on Ocana Avenue/Vernon Street from Los Arcos St. to 23rd. Then on Colorado St. from Bellflower Blvd. to Park Avenue.

Access will be limited to residents only when truck is on the street.

The survey truck will be operating from 9am-4pm.

We will update the blog with any changes!

Monday, March 26, 2012

Long Beach Geophysical Survey

Tuesday, March 27th

Truck One: The survey truck will be on Marwick Ave going North from Stearns St. to Vernon St. Then on Los Arcos St. going East from Radnor Ave to 405 Fwy. Then on Lomina Ave from/Radnor Ave going North from Los Arcos St to Stearns St.

Truck Two: The survey truck will be on Colorado St. going West from Park Ave W’ of Roswell Ave. Then on Santiago Ave going South from PCH to Colorado St.

Access will be limited to residence when the truck is on the street.

The survey trucks will be operating from 9am-4pm.

We will update the blig with any changes!

Friday, March 23, 2012

Long Beach Geophysical Survey

Monday, March 26th

Truck One: The survey truck will be on San Vicente Avenue from Stearns St. to Los Santos Dr. Los Santos Dr. from San Vicente Avenue to El Paseo St.

Truck Two: The survey truck will be on 4th St. from W' of Roswell to Park Avenue. Then on 3rd St. from Nieto Avenue to Belmont Avenue.

Access will be limited to residence when the truck is on the street.

The trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Thursday, March 22, 2012

Long Beach Geophysical Survey

Friday, March 23rd

Truck 1 - The survey truck will be on Marita Street going West from Palo Verde Avenue to Britton Drive. Then on Britton Drive going Northwest from Los Santos Dr. to San Anseline Avenue. Then on San Anseline Aveune going North from Britton Drive to Stearns Street. Then on Lomina Avenue going South from Stearns Street to Los Santos Drive.

Truck 2 - The survey truck will be on Park Avenue going North from Broadway to 3th Street. Then on Nieto Avenue going South from Colorado Street to Broadway. Then on Ximeno Avenue going North from 3th Street to Broadway.

Access will be limited to residence when the truck is on the street.

The trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Wednesday, March 21, 2012

Long Beach Geophysical Survey

Thursday, March 22nd

Truck One: The survey truck will be on Ashbrook Ave./Litchfield Ave./Daggett St./Garford St. going Northeast from Atherton St. to San Anseline Ave. Then on Los Santos Dr. going Northeast from San Anseline Ave. to Fairbrook St.

Truck Two: The survey truck will be on Ximeno Ave. going South from Shaw St. to 2nd St. Then on 2nd St. going West from Ximeno Ave. to Belmont Ave. Then on Broadway going East from Belmont Ave. to Ximeno Ave.

Access will be limited to residence when the truck is on the street.

The trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Long Beach Geophysical Survey

Wednesday, March 21st

Truck One:
The survey teuck will be on Don Julio St./Knoxville Ave. from Palo Verde Ave. to El Progresso St. Then on Vuelta Grande Ave. from Stearns St. to Willow St.


Truck Two:
The survey truck will be on Stanbridge Ave / Calderwood St. going East from Clark Ave. to Stearns St. Then Charlemagne Ave. going South from Stearns St. to N' of Calderwood St. Then on Stearnlee Ave. going North from Abbeyfield St. to Stearns St. Then on Abbeyfield St. going East from Stearnlee Ave. to Bellflower.

Access will be limited to residence when the truck is on the street.

The trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Monday, March 19, 2012

Long Beach Geophysical Survey

Tuesday, March 20th

Truck 1 - The survey truck will be on Vernon Street/Carfax Avenue going South from Willow Street to the 405 Freeway. Then on Snowden Avenue going South from Vernon Street to the 405 Freeway. Then on Los Arcos Street going West from Studebaker Road to Vuelta Grande Avenue. Then on Vuelta Grande Avenue/Los Santos Drive going South from Stearns Street to Studebaker Road.

Truck 2 - The survey truck will be on Bryant Road going North from El Jardin Street to El Parque Street. Then on El Jardin Street going West from Los Altos Avenue to Anaheim Road. Then on La Perla/El Cedral Street going East from El Mirador to Bryant Road.

The trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Long Beach Geophysical Survey

Monday, March 19th

Truck 1 - The survey truck will be on Vuelta Grande Avenue/Benmore Street going north on Snowden Avenue. Then on Snowden Avenue going south from Belen Street to Barbanell Street. Then on Barbanell Street going east from Snowden Avenue to Iroquois Avenue. Then on Vuelta Grande Avenue going northwest from Palo Verde Avenue to Barbanell Street.

Truck 2 - The survey truck will be on Ramillo Avenue/Greenbrier Road going northeast from Anaheim Road to El Parque Street. Then on Anaheim Road going west from El Parque Street to Clark Avenue. Then on Abbyfield Street going north from Atherton Street to Litchfield Avenue. Then on Tulare Avenue going south from Daggett Street to Atherton Street.

Access will be limited to residences hen the truck is on the street.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Friday, March 16, 2012

Long Beach Geophysical Survey

Friday, March 16th

Truck 1 - The survey truck will be on Deborah Street going east from Los Coyotes Diagonal to Faust Avenue. Then on Barrios Street going east from Radnor Avenue to San Vincente Avenue. Then on San Vincente Avenue going north from Willow Street to Oakbrook Street. Then on Oakbrook Street going south from Los Coyotes Diagonal to Deborah Street.

Truck 2 - The survey truck will be on Anaheim Road going east from El Parque Street to Bellflower Boulevard. Then on El Parque Street going west from Los Altos Avenue to Pacific Coast Highway.

Access will be limited to residence when the truck is on the street.

The trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Wednesday, March 14, 2012

Long Beach Geophysical Survey

Thursday, March 15th

Truck 1: The survey truck will be on Stanbridge Ave. going South from 28th Street to Willow Street. Then on Deborah Street going East from Bellflower Blvd. to Los Coyotes Diagonal. Then on Lomita Avenue/Oakbrook Street going South from Foreman Avenue to Los Coyotes Diagonal.

Truck 2: The survey truck will be on on Ramillo Avenue going North from El Jardin Street to El Parque Street. Then on Los Altos Avenue going North from Anaheim Street to El Jardin Street.

Access will be limited to residence when the truck is on the street.

The trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Long Beach Geophysical Survey

Wednesday, March 14th
One Survey truck will be on El Paseo Street/Knoxville Avenue going south from Palo Verde Avenue to Atherton Street. Then on Marita Street going east from Palo Verde Avenue to Knoxville Avenue. Then on Vuelta Grande Avenue going north from Atherton Street to Hidden Lane. Then on Hidden Lane going south from end of Hidden Lane to Studebaker Road.

Access will be limited to residents only when the truck is on the street.

The survey truck will be operating from 9am-4pm.

We will update the blog with any changes!

Tuesday, March 13, 2012

Long Beach Geophysical Survey

Tuesday, March 13th

The survey trucks will be on the Alamitos Generating Sub Station.

The survey trucks will be operating from 9am-4pm.

We will update the schedule with any changes!

Monday, March 12, 2012

Long Beach Geophysical Survey

Monday, March 12th

The survey trucks will be on the Alamitos Generating Sub Station.

The survey trucks will be operating from 9am-4pm.

We will update the schedule with any changes!

Thursday, March 8, 2012

Thursday, March 8th and Friday March 9th

The survey trucks will be in the wetlands off of PCH, south of 2nd Street.

They operate from 9am-4pm.

We will update the blog with any changes!

Wednesday, March 7, 2012

Long Beach Geophysical Survey

Wednesday, March 7th

The survey trucks will again be in the wetlands off of PCH and 2nd street, north of 2nd street.

They operate from 9am-4pm.

We will update the blog with any changes!

Tuesday, March 6, 2012

Long Beach Geophysical Survey

Tuesday, March 6th

The survey trucks will be in the wetlands off of PCH and 2nd street.

They operate from 9am-4pm.

We will update the blog with any changes!

Monday, March 5, 2012

Long Beach Geophysical Survey

Monday, March 5th

The survey trucks will be starting on Stearns St, beginning at Bellflower blvd at approximately 9am and heading West to Termino Ave.

Then they will be on Hathaway Ave, starting at Jacinto Way and heading South East to Outer Traffic Cir. This will complete the day.

The survey trucks operate from 9am-4pm.

We will update the blog with any changes!

Thursday, March 1, 2012

Long Beach Geophysical Survey

Friday, March 2nd

The survey trucks will be on 2nd Street at approximately 9am, traveling East on 2nd St from E. Marina Dr to Shopkeeper.

Then they will be on Wetland line 9210 (off of 2nd St), a dirt road adjacent to the bike path on the East side of the San Gabriel River, traveling South West from 2nd street and stopping where PCH crosses over the wetlands. This will complete the day.

The survey trucks operate from 9am-4pm.

We will update the blog with any changes!

Wednesday, February 29, 2012

Long Beach Geophysical Survey

Thursday, March 1st

The survey trucks will start on Bellflower Blvd, just South of the 405, at approximately 9am, and will travel South on Bellflower to Atherton.

Then they will head West on Atherton from Bellflower to Litchfield, ending the day at Atherton and Litchfield.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Tuesday, February 28, 2012

Long Beach Geophysical Survey

Wednesday, February 29th

UPDATED

The survey trucks will be starting on PCH at approximately 9am, heading South East from 2nd St. to the San Gabriel River.

They will continue to Shopkeeper, and head North West on the South East end of Shopkeeper to 2nd Street.

They will complete the day on Appian Way, heading North West from Lido Ln. to 2nd St.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Monday, February 27, 2012

Long Beach Geophysical Survey

Tuesday, February 28th

UPDATED

The survey trucks will start on 2nd street at approximately 9am, and head East on 2nd St. from Shopkeeper to Studebaker Rd.

Then they will be on E. Anaheim, heading West from Steveley Ave to Palo Verde.

They will complete the day's survey on Palo Verde, heading North on Palo Verde from E. Anaheim to Atherton.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Sunday, February 26, 2012

Long Beach Geophysical Survey

Mondy, February 27th

The survey trucks will be on E. Marina Dr. from Marina Dr. to 2nd St.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Thursday, February 23, 2012

Long Beach Geophysical Survey

Friday, February 24th

The survey trucks will be in the parking lot in Marina Park. Then on Appian Way from Sorrento Dr. To E. Maples Dr. Then the parking lot Soutwest of E. Marina Dr. Then the Southern tip of Marina Dr.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Wednesday, February 22, 2012

Long Beach Geophysical Survey

Thursday, February 23rd

The survey trucks will be on Ocean Blvd. from Roswell Ave. to 54th Pl. Then on 2nd St.from Sorrento Dr. to E. Naples Plaza. Then Bellflower Blvd. from 7th St. To Loynes Dr.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Tuesday, February 21, 2012

Long Beach Geophysical Survey

Wednesday, February 22nd

The survey trucks will be on Pacific Coast Highway going Southeast from Channel Dr. to 2nd St.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Monday, February 20, 2012

Long Beach Geophysical Survey

Tuesday, February 21st

The survey trucks will be on Studebaker Road going South from Loynes Drive to 2nd Street. Then on 2nd Street going East from Studebaker Road to San Gabriel River. Then on Pacific Coast Highway going Southeast from 7th St. to Channel Dr.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Long Beach Geophysical Survey

Monday, February 20th

There will be no survey trucks on the street. Happy Holiday!

Thursday, February 16, 2012

Long Beach Geophysical Survey

Friday, February 17th

The survey trucks will be on Pacific Coast Highway going Southeast from Clark Avenue to 7th Street.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Wednesday, February 15, 2012

Long Beach Geophysical Survey

Thursday, February 16th

The survey trucks will be on 7th St. going West from Park Ave. to Belmont Ave. Then on Livingston Dr. going Northeast from Belmont Ave. to Broadway.

The survey trucks will be operating from 9am-4pm

We will update the blog with any changes!

Tuesday, February 14, 2012

Long Beach Geophysical Survey

Wednesday, February 15th

The survey trucks will be on 7th St. going West from Pacific Coast Highway to Park Avenue. Then on Pacific Coast Highway going Southeast from Outer Traffic Circle to Clark Avenue.

The survey trucks will be operating from 9am-4pm.

We will update the schedule with any changes!

Monday, February 13, 2012

Long Beach Geophysical Survey

Tuesday, February 14th

The survey trucks will be on 7th Street going West from San Gabriel River to Pacific Coast Highway. Then on Willow St. going West from Lakewood Blvd. to Belmont Ave.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Long Beach Geophysical Survey

Monday, February 13th

The survey trucks will be on Appian Way going Southeast from Park Avenue to Bay Shore Avenue.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Friday, February 10, 2012

Long Beach Geophysical Survey

Saturday, February 11th

The survey trucks will be on Cal State University of Long Beach. First on W. Capmus Dr.-E. State University Dr. going North from 7th St. to Bellflower Blvd. Then on road East of Softball Field going South from the Softball Field to the Tennis Courts. Then on road East of Tennis Courts going South from the Tennis Courts to E. State University Dr.

The survey trucks will be operating from 9am-4pm.

We will update the schedule with any changes!

Thursday, February 9, 2012

Long Beach Geophysical Survey

Friday, February 10th

The survey trucks will be on Atherton Street going West from Fanwood Avenue to Bellflower Boulevard. Then on Bellflower Boulevard going South from Atherton Street to 7th Street.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Wednesday, February 8, 2012

Long Beach Geophysical Survey

Thursday, February 9th

The survey trucks will be on Clark Avenue going South from Willow Street to Pacific Coast Highway.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Tuesday, February 7, 2012

Long Beach Geophysical Survey

Wednesday, February 8th

The survey trucks will be on Atherton Street going West from Litchfield Avenue to Outer Traffic Circle. Then on Federation Drive going South from Park Avenue to 7th Street.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Monday, February 6, 2012

Long Beach Geophysical Survey

Tuesday, February 7th

The survey trucks will be on Studebaker Rd going South from Atherton St. to Loynes Dr.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Sunday, February 5, 2012

Long Beach Geophysical Survey

Monday, February 6th

The survey trucks will be on Los Coyotes Diagonal from Bellflower Blvd. to Outer Traffic Circle.

The survey trucks will be operating from 9am-4pm.

We will update the schedule with any changes!

Friday, February 3, 2012

Long Beach Geophysical Survey

Saturday, February 4th

The survey trucks will be at CSULB Parking lot West of Pyramid going East from Earl Warren Drive to Mariam Way. Then at Parking lot SE' of Japanese Garden going Northwest from parking to Earl Warren Drive. Then on Earl Warren Drive going South from parking to E. State University Drive. Then on Mariam Way going North from E. State University Drive to Atherton Street. Then on Earl Warren Drive going South from Atherton Street to the Drainage Channel.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Thursday, February 2, 2012

Long Beach Geophysical Survey

Friday, February 3rd

The survey trucks will be at CSULB South of Pyramid going East from Merriam Way to Palo Verde Avenue. Then on State University Drive - E. Campus Drive going West from Palo Verde Avenue to 7th Street.

The survey trucks will be operating from 9am-4pm.

We will update the schedule with any changes!

Wednesday, February 1, 2012

Long Beach Geophysical Survey

Thursday, February 2nd

Survey trucks on Stearns Street going West from Vuelta Grande Avenue to Bellflower Boulevard.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changeS!

Tuesday, January 31, 2012

Long Beach Geophysical Survey

Wednesday, February 1st

Survey trucks will be on Stearns Street going West from Studebaker Road to Vuelta Grande Avenue. Then on Palo Verde Avenue going South from Stearns Street to Atherton Street. Then on Atherton Street going West from Palo Verde Avenue to Fanwood Avenue.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Monday, January 30, 2012

Long Beach Geophysical Survey

Tuesday, January 31st

The survey trucks will be on Studebaker Road going South from Willow Street to Atherton Street. Then on Atherton Street going West from Studebaker Road to Palo Verde Avenue.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Thursday, January 26, 2012

Long Beach Geophysical Survey

Friday, January 27th

The survey trucks will be on Palo Verde Avenue going North from Stearns Street to Barbanell Street. Then on Los Coyotes Diagonal going Southwest from Woodruff Avenue to Spring Street. Then on Spring Street going East from Los Coyotes Diagonal to Woodruff Avenue. Then on Woodruff Avenue going South from Spring Street to Willow Street. And last on Willow Street going West from Monogram Avenue to Palo Verde Avenue.

The survey trucks will be operating from 9am-4pm.

We will update the schedule with any changes!

Wednesday, January 25, 2012

Long Beach Geophysical Survey

Thursday, January 26th

Survey trucks on Willow Street going west from Palo Verde Avenue to Bellflower Boulevard. Then on Willow Street going west from Clark Avenue to Belmont Avenue.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Tuesday, January 24, 2012

Long Beach Geophysical Survey

Wednesday, January 25th

The survey trucks on Los Coyotes Diagonal going Southwest from Spring to Willow Street. Then on Willow Street going West from Bellflower Boulevard to Clark Avenue.

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Monday, January 23, 2012

Long Beach Geophysical Survey

Tuesday, January 24th

The survey trucks will be on Spring St. going West from Los Coyotes Diagonal to the Tunnel (W' of Lakewood).

The survey trucks will be operating from 9am-4pm.

We will update the blog with any changes!

Sunday, January 22, 2012

Long Beach Geophysical Survey

Monday, January 23rd

UPDATE: There will be no seismic trucks on the streets today due to weather.

We will update the blog with any changes!

Thursday, January 19, 2012

Long Beach Geophysical Survey

Friday, January 20th

The survey trucks will be on Bellflower Blvd. going South from Killdee St. to Willow St. Then they will be on Wardlow Rd. going West from Charlemagne Ave. to Lakewood Blvd.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!

Wednesday, January 18, 2012

Long Beach Geophysical Survey

Thursday, January 19th

The survey trucks will be on Clark Ave. going South from Monlaco Rd. to Willow St.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!

Tuesday, January 17, 2012

Long Beach Geophysical Survey

Wednesday, January 18th

The survey trucks will be on Lakewood Blvd. going South from Spring St. to the Outer Traffic Circle.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!

Monday, January 16, 2012

Long Beach Geophysical Survey

Tuesday, January 17th

The survey trucks will be on Conant St. going West from Faculty Ave. to Worsham Ave. Then on Lakewood Blvd. going South from Cover St. to Spring St.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!