Friday, July 22, 2011

Geophysical Survey

Friday, July 22st

The survey trucks will be on 10th St. from Belmont to Deukmejian Dr. Then on Anaheim St. from PCH to Belmont Ave. Next on 15th St. from Termino Ave to PCH. Last on Park Ave. from PCH to Los Coyotes Diagonal.

The survey truck will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!

Tuesday, July 19, 2011

Geophysical Survey

Wednesday, July 20th

The survey truck will be on 23rd. St. going East from Termino Ave. to Clark Ave. Then on Garford St. going West from Fidler Ave to N. Park Ave. Then on N. Beverly Plaza going South from Los Coyotes Diagonal to Garford St. Then on E. La Cara St. going Northwest from Los Coyotes Diagonal to E. De Oro Way. Next on E. Cervato St. going Southeast from E. De Oro Way to Los Coyotes Diagonal. Then on E. De Oro Way going Southwest from Stearns St. to Lakewood Blvd. Last on E. La Cara St. going Southwest from Lakewood Blvd. to Euclid Ave.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, July 18, 2011

Geophysical Survey

Tuesday, July 19th

The survey truck will be on Ximeno Ave. going South from Ransom St. to 4th St. Then on Park Ave. going North from 4th St. to 15th St.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Geophysical Survey

Monday, July 18th, we are scheduled for:

Team #1

The survey truck will be on 28th St. going East from Clark Ave to Bellflower Ave. Then on San Anseline Ave. going North from Spring St. to Rosebay St. Next on E. Mezzanine Way. going West from Chatwin Ave. to N. Rutgers Ave. Then on E. Mezzanine Way. going East from Clark Ave. to N. Charlemagne Ave. And last on N. Charlemagne going North from Spring St to Wardlow Rd.


Team #2

The survey truck will be on Vuelta Grande Ave. going South from Willow St. to Stearns St. Then on E. Los Arcos St. going West from Studebaker Rd. to Vuelta Grande Ave. Next on E. La Marimba St going East from Vuelta Grande Ave to Studebaker Rd. Then on Knoxville-Don Julio Ave. going North from Iroquois Ave. to Palo Verde Ave. Next on E. Cantel St. going South from E. Don Julio St. to Palo Verde St. And last on Snowden Ave. going North from Woodruff Ave. to E. Vernon St.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Thursday, July 14, 2011

Geophysical Survey

Friday, July 15th

Survey trucks will be on Stearns Street going East from Termino Avenue to Palo Verde Avenue.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Geophysical Survey

Thursday, July 14th

Survey trucks will be on Bellflower Boulevard going South from Killdee Street to Willow Street. Then on Los Coyotes Diagonal going North-east from Willow Street to Woodruff Avenue. Next on Palo Verde Avenue going South from Barbane Street to Willow Street. Last on Woodruff Avenue going North from Willow Street to Spring Street.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Wednesday, July 13, 2011

Geophysical Survey

Wednesday, July 13th

Survey trucks will be onLakewood Boulevard going North from Willow Street to Wardlow Road. Then on Conant Street going East from Worsham Avenue to Faculty Avenue. Last on Clark Avenue going South from Monlaco Road to Willow Street.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, July 12, 2011

Geophysical Survey

Tuesday, July 12th

The survey trucks will be on Spring St. going East from West of Lakewood Blvd. to Woodruff Ave. Then on Wardlow Rd. going West from Charlemagre to Lakewood Blvd. Last on Lakewood Blvd. North from Wardlow Rd. to Cover St.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Sunday, July 10, 2011

Geophysical Survey

Monday, July 11th

Survey trucks heading east on Willow Street from Belmont Avenue to Monogram Street.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!

Thursday, June 23, 2011

Geophysical Survey

Thursday, June 23rd

The survey truck will be in 4 separate places today. The first location will be on East Conant St. between Heinemann St. and Lakewood Blvd. Then on North Country Club Dr. between San Antonio Dr. and Los Cerritos Park Pl. Next on Fairbanks Ave. North of West Chester Pl. And last on Ocean Blvd. between Temple Ave. and Orizaba.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Wednesday, June 22, 2011

Geophysical Survey

Wednesday, June 22nd

The survey truck will be on private property. Please refer to area F on the project website www.lbgeophysical.com under the the maps section.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, June 21, 2011

Geophysical Survey

Tuesday, June 21st

The survey truck will be on private property. Please refer area E on the project website www.lbgeophysical.com under the maps section.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, June 20, 2011

Geophysical Survey

Monday, June 20th

The survey truck will be on private property. Please refer to area D on the project website www.lbgeophysical.com under the map section.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Friday, June 17, 2011

Geophysical Survey

Friday, June 17th

The survey truck will be on private property. Please refer to area C-1 and C-2 on the project website www.lbgeophysical.com under the map section.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Thursday, June 16, 2011

Geophysical Survey

Thursday, June 16th

The survey truck will be on private property. Please refer to Area B on the project website www.lbgeophysical.com and go to the map tab for truck location.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Wednesday, June 15, 2011

Geophysical Survey

Wednesday, June 15th

The survey truck will be on Area A on private property. Please refer to map on Calendar section of the project website www.lbgeophysical.com

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, June 14, 2011

Geophysical Survey

Tuesday, June 14th

Survey truck will be on Hill St. going West from Redondo to Stanley. Then on Stanley going South from Hill St. to 21st St. Last on Junipero Ave. going South from 21st St. to PCH.

The survey truck will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!

Monday, June 13, 2011

Geophysical Survey

Monday, June 13th

The survey truck will be on 21st St. from Cherry Ave. to Temple. Then on 20th St. from Temple to Walnut.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Friday, June 10, 2011

Geophysical Survey

Friday, June 10th

Survey truck will be on Temple going South from Panorama Dr. to PCH. Then on Orizaba Ave. going North from PCH to Ridgeview.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Thursday, June 9, 2011

Geophysical Survey

Thursday, June 9th

The survey truck will be on 19th St. going West from Orizaba to Cherry Ave. Then on Hill St. going West from Cherry to Orange Ave.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!

Tuesday, June 7, 2011

Geophysical Survey

Wednesday, June 8th

The survey truck will be on Junipero Ave. going North from Combellack Dr. to Spring St. Then on 20th St. going West from Obispo Ave. to Temple.

The survey truck will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!

Geophysical Survey

Tuesday, June 7th

The survey truck will be on Creston Ave. going West from Cul-de-sac (east end) to Walnut. Then on 25th St. going East from Walnut to Cherry. Last on Burnett St. going West from Cherry to California.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, June 6, 2011

Geophysical Survey

Monday, June 6th

The survey truck will be on 25th St. going East from Lewis to Orange. Then on Dawson Ave. going North from Willow to 28th St. Next on Signal Pkwy going South from 28th St. to Willow. Last on 27th St. going West from Junipero to Rose.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Friday, June 3, 2011

Geophysical Survey

Friday, June 3rd

The survey truck will be on Palm Dr. From Temple to Willow. Then on 28th St. From Temple to Cherry. Last on 28th St. from Orange to Cherry.

The survey truck will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!

Wednesday, June 1, 2011

Geophysical Survey

Thursday, June 2nd

The survey truck will be on 27th St. going West from Walnut to Gundry. Then on Walnut going South from Spring St. to 20th St.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Geophysical Survey

Wednesday, June 1st

The survey truck will be on 32nd St. going East from California to Orange. Next on Orange going North from 32nd St. to Wardlow. Then on Walnut going South from Wardlow to 32nd St. Last on 29th St. going West from Cherry to Orange.

The survey truck will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!

Tuesday, May 31, 2011

Geophysical Survey

Tuesday, May 31st

Survey truck will be on California going South from Wardlow to Burnett. Then on 27th St. going East from Atlantic to California.

The survey truck will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!

Monday, May 30, 2011

Geophysical Survey

Monday, May 30th

There will be no survey work. Happy Memorial Day!

Friday, May 27, 2011

Geophysical Survey

Friday, May 27th

Survey trucks will be on Temple-Obispo going South from Willow to Hill St. Then on Obispo Ave. going South from 20th St. to PCH. Next on Redondo going South from Reservoir Dr. to PCH. Last on PCH going West from Reservoir Dr. to Temple.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Thursday, May 26, 2011

Geophysical Survey

Thursday, May 26th

The survey trucks will be on Orange Ave. going South from Willow to Hill St. Then on Cherry Ave. going South from Willow to 19th St.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!

Wednesday, May 25, 2011

Geophysical Survey

Wednesday, May 25th

The survey truck will be on Spring St. going East from Pacific Avenue to Long Beach Blvd. Then on 31st St. going East from Del Mar to Atlantic. Next on 20th St. going East from Obispo Ave. to Redondo Ave. Last on Ximeno going North from 7th St. to 10th St.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, May 24, 2011

Geophysical Survey

Tuesday, May 24th

Survey trucks will be on Ocean blvd. from Cherry to Hermosa. Then on Shoreline Dr. from Ocean Blvd. to the L.A. River.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, May 23, 2011

Geophysical Survey

Monday, May 23rd

The survey trucks will be on Pacific Pl. from the 405 Fwy to Pacific Ave. Then on Pacific Ave. from Pacific Pl. to 27th St.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!

Friday, May 20, 2011

Geophysical Survey

Friday, May 20th

Survey trucks will be on Pacific Ave. from 27th St. to PCH.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Wednesday, May 18, 2011

Geophysical Survey

Thursday, May 19th

Survey trucks will be on Ocean Blvd. going East from L.A. River to Cherry Ave.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Geophysical Survey

Wednesday, May 18th

Survey trucks will be on Obispo Ave. going South from Hill St. to 20th St. Then on Alamitos Ave. going North from Ocean Blvd. to 7th St. Last on 7th St. going West from Atlantic Ave. to Golden Ave.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, May 17, 2011

Geophysical Survey

Tuesday, May 17th

The survey trucks will be on Anaheim from Atlantic Ave. to the L.A. River. Then on PCH from L.A. River to Pacific Ave.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, May 16, 2011

Geophysical Survey

Monday,May 16th

The survey trucks will be on Willow from the LA River to Atlantic Ave. Then on PCH from Pacific Ave.to Atlantic Ave.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Friday, May 13, 2011

Geophysical Survey

Friday, May 13th

The survey trucks will be on Atlantic Ave from Ocean to PCH.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with changes!

Thursday, May 12, 2011

Geophysical Survey

Thursday, May 12th

The survey trucks will be on Atlantic Ave. going North from PCH to Spring St.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, May 10, 2011

Geophysical Survey

Wednesday, May 10th

The survey trucks will be on Long Beach Blvd. going North from Ocean to PCH.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Geophysical Survey

Tuesday, May 10th

The survey trucks will be on Long Beach Blvd. going South from Spring St. to PCH.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, May 9, 2011

Geophysical Survey

Monday May 9th

Survey trucks will be on Atlantic Avenue going South from 31st to Spring Street. Then on Spring Street going West from Atlantic to Long Beach Blvd. Next on Long Beach Blvd going North from Spring St to 31st.Last on Wardlow going West from 405 Freeway to LA River.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Friday, May 6, 2011

Geophysical Survey

Friday, May 6th

Survey truck will be on Pacific Ave. from Ocean Blvd. to E 15th St.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Thursday, May 5, 2011

Geophysical Survey

Thursday, May 5th

Survey truck will be on Pacific Ave. going South from PCH to East 15th St. Then on 16th St. going West from Magnolia Ave to San Francisco Ave. Last on San Francisco Ave. going North from Anaheim Rd. to PCH.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, May 3, 2011

Geophysical Survey

Wednesday, May 4th

The survey truck will be on 4th St. going West from Long Beach Blvd. to Pine Ave. Then on Golden Shore St. going North from the Water to Ocean Blvd. Next on Magnolia Ave. going North from 3rd St. to 7th St.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Geophysical Survey

Tuesday, May 3rd

The survey truck will be on MLK Blvd. going South from 7th St. to Alamitos Ave. Then on 4th St. going West from Alamitos Ave. to Golden Ave.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, May 2, 2011

Geophysical Survey

Monday, May 2st

Survey truck will be on Broadway going East from Shoreline Dr. to Orange Ave.

Survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Thursday, April 28, 2011

Geophysical Survey

Thursday, April 28th

Survey truck will be on 10th St. from Atlantic to end of 10th West of Maine Ave. Then Maine St. from 7th to Loma Vista Dr. After that Loma Vista Dr. from Maine St. to Daisy Ave. Last on Daisy Ave. from Loma Vista Dr. to Anaheim.

Survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Wednesday, April 27, 2011

Geophysical Survey

Wednesday, April 27th

Survey truck will be on La Cara St. from Euclid to Lakewood. Then on E. De Ora Way from Lakewood to La Cara St. Last on La Cara St. from De Ora Way to LCD.

Survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, April 26, 2011

Geophysical Survey

Tuesday, April 26th

Survey truck will be on Burnett St. from Grand to Redondo. Then on Grand from 23rd St. to Stearns St. Last on Hathaway from Redondo to Outer Traffic Circle.

Survey trucks will operate from 9:00am-4:00pm.

We will update the blog with any changes!

Sunday, April 24, 2011

Geophysical Survey

Monday, April 25th

Survey truck will be on Obispo Ave. going North from 4th St. to PCH.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Thursday, April 21, 2011

Geophysical Survey

Thursday, April 21st

Survey truck will be on 4th St. from Orange to Temple.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Wednesday, April 20, 2011

Geophysical Survey

Wednesday, April 20th

The survey truck will be on Junipero Ave. going North from 7th St. to PCH.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, April 18, 2011

Geophysical Survey

Tuesday, April 19th

Survey truck will be on Burnett St. going West from Olive to Atlantic. Then on 15th St. going East from Lewis Ave. to Molino.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Geophysical Survey

Monday, April 18th

Survey truck will be on 4th St. going East from Temple to Termino. Then on 10th St. going East from Termino to Federation Dr.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Friday, April 15, 2011

Geophysical Survey

Friday, April 15th

One survey truck wil be on 15th St. going East from Temple to Ximeno.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Wednesday, April 13, 2011

Geophysical Survey

Wednesday, April 13th

The survey truck will be on 20th St. going East from Orange to Walnut. Then on Walnut going South from 20th St. to Anaheim.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, April 12, 2011

Geophysical Survey

Tuesday, April 12th

Team 1: One survey truck will be on 10th St. from Atlantic to Walnut. Then on Walnut from 10th St. to 4th St.

Team 2: One survey truck will be on 23rd St. from Euclid to Clark. Then on Roycroft from Vernon to 23rd.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, April 11, 2011

Geophysical Survey

CORRECTION:

Monday, April 11th

Team One: One survey truck will be on 20th St. from Orange to Atlantic. Then on MLK from 15th St. to 7th St..

Team 2: One survey truck will be on Termino from 7th St. to 4th St. Then on 4th St. from Termino to Park. Last on Park from 4th St. to 7th St.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Geophysical Survey

No survey trucks out today.

Friday, April 8, 2011

Geophysical Survey

Friday, April 8th

One survey truck will be on Termino going South from Hathaway to 8th.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Thursday, April 7, 2011

Geophysical Survey

Thursday, April 7th

Team 1: One survey truck will be on MLK going South from Burnett to 15th. Then on 15th going West from MLK to Atlantic.

Team 2: One survey truck will be on Termino going South from 4th to 3rd. Then on 3rd going East from Termino to Ximeno. Last on Park going North from Broadway to 4th.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Wednesday, April 6, 2011

Geophysical Survey

Wednesday, April 6th

Team 1: One survey truck will be on Arbor Rd. from Lakewood to Clark. Then on Harvey Way from Clark to Lakewood.

Team 2: One survey truck will be on 3rd St. from Junipero to Termino.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, April 5, 2011

Geophysical Survey

Tuesday, April 5th

Team 1: One truck will be on Del Mar Ave. from Los Cerritos Park Plaza to the North end of Los Cerritos Pl. Then on Hill St. from Orange to Atlantic.

Team 2: One survey truck will be on Walnut from 4th St. to 3rd St. Then on Falcon from 3rd St. to Ocean. Next on Gaviota from Ocean to 3rd St. Then on Lindero from Broadway to 3rd St. Last on Wisconsin from 3rd St. to 4th St.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, April 4, 2011

Geophysical Survey

Monday, April 4th

Team 1: One survey truck will be on Country Club Dr. going North from Los Cerritos Park Plaza back around to Country Club Dr. Then on Stewart Way going East from Country Club Dr. to San Antonio Dr. Last on San Antonio Drive going Northeast from Stewart Way to Virginia Rd.

Team 2: One survey truck on Obispo Ave. going South from 4th St. to Broadway. Then on Termino going North from Livingston to 3rd St.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Friday, April 1, 2011

Geophysical Survey

Friday, April 1st

Team 1: One survey truck will be on Roosevelt Rd. going East from San Antonio Dr. to Cerritos Ave.

Team 2: One survey truck will be on Junipero going South from 7th St. to Broadway. Then on Broadway going West from Junipero to Orange.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Thursday, March 31, 2011

Geophysical Survey

Thursday, March 31st

Team 1: one survey truck will be on Tehachapi from Olive to California. Then on California from Tehachapi to Wardlow.

Team 2: one survey truck will be on Broadway from Obispo to Junipero. Then on Junipero from Broadway to Ocean. Last on Lindero from Ocean to Broadway.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Wednesday, March 30, 2011

Geophysical Survey

Wednesday, March 30th

Team 1: One survey truck will be on Walnut from Roosevelt to Keever. Then on Keever from Walnut to Falcon. Last on Falcon from Keever to San Antonio.

Team 2: One survey truck will be on 2nd St. from Livingston to Paloma. Then on Paloma from Broadway to Ocean.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, March 29, 2011

Geophysical Survey

Tuesday, March 29th

Team 1: One survey truck will be on Walnut from 37th St. to Roosevelt. Then Roosevelt from Cherry to Orange. Last on California from San Antonio to Tehachapi.

Team 2: One survey truck on Broadway from Park to Obispo.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, March 28, 2011

Geophysical Survey

Monday, March 28th

Team 1: One survey truck will be on E 29th St. from Redondo to Temple. Next on Walnut from Spring to 32nd St.Then on Walnut from Wardlow to 37th St.

Team 2: One survey truck will be on Ximeno from Broadway to Livingston. Then on Livingston from Ocean to Nieto. Next on Broadway from Nieto to Park. Last on Park from Broadway to Livingston.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Thursday, March 24, 2011

Geophysical Survey

Thursday, March 24th

Team 1: One survey truck will be on Bixby Rd. going East from Long Beach Blvd to Cherry Ave.

Team 2: One survey truck will be on Temple going South from 4th St. to Ocean. Then on 3rd St. going West from Junipero to Orange.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Wednesday, March 23, 2011

Geophysical Survey

Wednesday, March 23rd

Team 1: One Survey truck will be on Pacific going South from Country Club Dr. to 405. Then on Bixby Rd. going East from Country Club Dr. to Long Beach Blvd.

Team 2: One Survey truck will be on Temple going South from PCH to 4th Street.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, March 22, 2011

Geophysical Survey

Tuesday, March 22nd

Fleet 1: Survey truck will be on 45th St. going West from Cherry to Banner Dr. Then on San Antonio Dr. going Southwest from Long Beach Blvd to Virginia Rd. Next on Virginia Rd. going North from San Antonio Dr. to Country Club Dr. Last on Country Club Dr. going West from Virginia Rd to Devon Pl.

Fleet 2: Survey truck will be on Cherry going South from Anaheim to Ocean.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, March 21, 2011

Geophysical Survey

Monday, March 21st

Survey trucks will be on Orange Ave. going South from 15th St. to Ocean Blvd.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Friday, March 18, 2011

Geophysical Survey

Friday, March 18th

Survey trucks will be on Stearns between Clark and Redondo.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!

Thursday, March 17, 2011

Geophysical Survey

Thursday, March 17th

Survey trucks will be on Graywood between Del Amo and Harvey Way. Then on Faculty between Harvey Way and Carson.

Survey trucks will operate from 9:00am-4:00pm.

We will update the blog with any changes! HAPPY ST. PATRICK'S DAY!

Wednesday, March 16, 2011

Geophysical Survey

Wednesday, March 16th

Survey trucks will be on PCH going West from Clark to Reservoir. Then on Centralia going West from Clark to Lakewood.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, March 15, 2011

Geophysical Survey

Tuesday, March 15th

Survey trucks will be on PCH from Junipero to Atlantic.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, March 14, 2011

Geophysical Survey

Monday, March 14th

Survey trucks will be on Ocean going West from Redondo to Cherry. Then on PCH going West from Temple to Junipero.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Thursday, March 10, 2011

Geophysical Survey

Friday, March 11th

Survey trucks will be on Ocean going West from Livingston Dr. to Redondo Ave. Then on 7th Street going West from Obispo Ave. to Cherry Ave. Last on Anaheim going West from MLK to Atlantic.

Survey trucks will operate from 9:00am-4:00pm.

We will update the blog with any changes!

Geophysical Survey

Thursday, March 10th

Survey trucks will be on Orange going South from Hill to 17th St. Then on Alamitos going South from 17th St. to 7th St.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Wednesday, March 9, 2011

Geophysical Survey

Wednesday, March 9th

Survey trucks will be on Cherry Ave. going South from PCH. to Anaheim. Then on 7th St. going West from Cherry to Atlantic.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, March 8, 2011

Geophysical Survey

Tuesday, March 8th

Survey trucks will be on 7th Street going West from Federation Dr. to Obispo Ave.

Survey trucks will operate from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, March 7, 2011

Geophysical Survey

Monday, March 7th

Survey trucks on Anaheim Avenue heading west fromTemple to Martin Luther King Boulevard.

Survey trucks will operate from 9:00am-4:00pm.

We will update the blog with any changes!

Friday, March 4, 2011

Geophysical Survey

Friday, March 4th

Survey trucks will be on Los Coyotes Diagonal going Southwest from Clark to Outer Traffic Circle. Then on Anaheim going West from Ximeno to Temple.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Thursday, March 3, 2011

Geophysical Survey

Thursday, March 3rd

Survey trucks will be on Clark going South from Willow to PCH. Then on Anaheim going West from Clark to Ximeno.

Survey trucks will operate from 9:00 am-4:00 pm.

We will update the blog with any changes!

Wednesday, March 2, 2011

Geophysical Survey

Wednesday, March 2nd

Survey trucks will be on Clark going South from Carson to Lew Davis. Then will be on Lakewood going South from just south of the 405 FWY to Outer Traffic Circle. Last on Atherton going East from Outer Traffic Circle to Clark.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, March 1, 2011

Geophysical Survey

Tuesday, March 1st

Survey trucks will be on Redondo going South from 11th St. to Ocean.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, February 28, 2011

Geophysical Survey

Monday, February 28th

Survey trucks will be on Redondo going South from Willow to 11th St.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Wednesday, February 23, 2011

Geophysical Survey

Wednesday, February 23rd

Survey trucks will be on Long Beach Blvd. from the 405 FWY to San Antonio Dr.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!

Monday, February 21, 2011

Geophysical Survey

Tuesday, February 22nd

Survey trucks will be on Long Beach Blvd. from 31st St. to the 405 FWY. Then on Wardlow from Atlantic to LA River.

Survey trucks will operate from 9:00am-4:00pm.

We will update the blog with any changes!
Monday, February 21st

Survey trucks will be on Atlantic from San Antonio Dr. to 31st.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the schedule with any changes!

Thursday, February 17, 2011

Geophysical Survey

Friday, February 18th

Survey trucks will be on Faculty going South from Carson to Conant. Then on Wardlow going West from Clark to Lakewood. Last on Lakewood going South from Spring to Willow.

Survey trucks will operate from 9:00am-4:00pm.

We will update the schedule with any changes!

Wednesday, February 16, 2011

Geophysical Survey

Thursday, February 17th

Survey trucks will be on Lakewood Blvd. going South from just south of Carson St. to Spring St.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, February 15, 2011

Geophysical Survey

Wednesday, February 16th

Survey trucks will be on Lakewood going South from Del Amo to just past Carson.

Survey trucks will operate from 9:00am-4:00pm.

We will update the blog with any changes!

Geophysical Survey

Tuesday, February 15th

Survey trucks will be on Clark going South from Conant to Willow.

Survey trucks will operate from 9:00am-4:00pm.

We will update the blog with any changes!

Sunday, February 13, 2011

Geophysical Survey

Monday, February 14ths

Survey trucks will be on Clark going South from Del Amo to Conant.

Survey trucks will operate from 9:00am-4pm.

We will update the schedule with any changes!

Thursday, February 10, 2011

Geophysical Survey

Friday, February 11th

Survey trucks will be inside the airport and then on Worsham between Conant and Carson.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Geophysical Survey

Thursday, February 10th

Survey trucks will be on Wardlow going West from Cherry to Atlantic. Then on Worsham Ave. going North from Conant to Carson.

Survey trucks will be operating from 9:00am-4:00pm

We will update the blog with any changes!

Tuesday, February 8, 2011

Geophysical Survey

Wednesday, February 9th

Survey trucks will be on 36th Street from Lakewood City boundary to Globemaster. Then on Wardlow from the Long Beach Airport to Cherry.

Survey trucks will operate from 9:00am-4:00pm.

We will update the blog with any changes!

Geophysical Survey

Tuesday, February 8th

Survey trucks will be on Schaffle between Conant and Cover. Then on Cover between Lakewood Blvd and LB Airport. Last on Carson between Atlantic and Elm.

Survey trucks will operate from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, February 7, 2011

Monday, February 7th

Survey trucks will be on Carson Street going West from the railroad track just east of Cherry to California St.

The survey trucks will operate from 9:00am-4:00pm.

We will update the schedule with any changes!

Thursday, February 3, 2011

Geophysical Survey

Friday, February 4th

Survey trucks will be on Carson Street going West from Clark to Lakewood City boundary (west of Lakewood Blvd). Then on Heinemann going North from Conant to Cover.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Geophysical Survey

Thursday, February 4th

One survey truck will be on Orange going South from Armando to Wardlow. Then on Orange going South from the 405 to Spring St. Last on Conant St. going West from Worsham Ave. to Heinemann Ave.

Survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Wednesday, February 2, 2011

Geophysical Survey

Wednesday, February 2nd

One survey truck will be on Orange going South from San Antonio Drive to South of Armando.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Tuesday, February 1, 2011

Geophysical Survey

Tuesday, February 1st

One survey truck will be on San Antonio Drive going Northeast from Goldfield to Cherry. Then survey trucks will be on Conant St. going West from Clark to Worsham.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Monday, January 31, 2011

Geophysical Survey

Monday, January 31st

One survey truck will be on San Antonio Drive going Northeast from Long Beach Blvd. to Goldfield.

The survey truck will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Thursday, January 27, 2011

Geophysical Survey

Friday, January 28th

Survey trucks will be on Cherry going North from Carson Street to San Antonio.

The survey trucks will be operating from 9:00am-4:00pm.

We will update the blog with any changes!

Geophysical Survey

Thursday, January 27th

Survey trucks will be on Cherry Avenue going North from Spring Street to Carson Street.

The survey trucks will be operating from 9:00am-4:00pm.

We wil update the blog with any changes!

Tuesday, January 25, 2011

Geophysical Survey

Wednesday, January 26th

Survey trucks will be on Redondo going South from Spring to Willow. Then on Willow going West from Redondo to Temple. Next on Spring going West from Orange to Olive.

Survey trucks will be operating from 9:00am-4:00pm.

We will update this blog with any changes!

Geophysical Survey

Tuesday, January 25th

Survey trucks will be on Spring going West from Clark to Junipero.

Survey trucks will be operating from 9:00am-3:30pm.

We will update the blog with any changes!

Monday, January 24, 2011

Geophysical Survey

Monday, January 24th

The survey trucks will be on Willow going West from Clark to North Palm Drive.

Survey trucks will be operating from 9:00am-3:30pm.

We will update the blog with any changes!

Friday, January 21, 2011

Geophysical Survey

Friday, January 21st

Survey trucks will be on Orange going South from Spring to Willow. Then on Willow going West from Olive to Atlantic. Then on Temple going South from 27th to Willow.

The survey trucks will be operating from 9:00am-3:30pm.

We will update the blog with any changes!

Wednesday, January 19, 2011

Geophysical Survey

Thursday, January 20th

The survey trucks will be on Willow going West from Lemon to Olive. Then on Cherry going North from Willow to Spring. Last on Temple going South from the 405 to 27th.

The survey trucks will be operating from 9:00am-3:30pm.

We will update this blog with any changes!

Geophysical Survey

Wednesday, January 19th

Four survey trucks will be on Spring St. going West just past Olive St. to Atlantic Ave. Then on Willow going West from Temple Ave. to Lemon.

The survey trucks will be operating from 9:00am-3:30pm.

We will update this schedule with any changes!

Monday, January 17, 2011

Geophysical Survey

Tuesday, January 18th

Four survey trucks will be on Spring St. going West from the 405 Fwy (Junipero Ave.) to Orange Ave. and then on Spring St. going West from SH City Boundary (between Orange Ave. and California Ave.) to just before Atlantic Ave.

The survey trucks will be operating from 9:00am-3:30pm.

We will update this schedule if there are any changes!

Wednesday, January 12, 2011

Long Beach-Signal Hill Geophysical Survey

The Long Beach-Signal Hill Geophysical Survey will begin the week of January 18th 2011. Four survey trucks will be on the streets listed below. The survey trucks will be operating during regular business hours. This schedule is subject to change. Please refer to this blog for any updates.

If you have any questions or concerns, feel free to look at our website www.lbgeophysical.com or call Nodal Seismic at (562) 326-5186.

WEEK ONE:

Tuesday, January 18th- Survey trucks on Spring St., from the 405 Fwy (Junipero Ave.) to Orange Ave.
AND on Spring St., from SH City Boundary (between Orange Ave. and California Ave.) to Olive Ave.

Wednesday, January 19th- Survey trucks on Willow St., from Temple Ave. to Gundry.
AND on Spring St., from Olive Ave. to Atlantic Ave.

Thursday, January 20th- Survey trucks on Orange Ave., from Wardlow Rd. to Willow St.
AND on Willow St., from Gundry to Orange Ave.

Friday, January 21st- Survey trucks on Cherry Ave., from Willow St. to Spring St.
AND on Temple Ave., from the 405 Fwy to Combellack Dr.

WEEK TWO:

Monday, January 24th- Survey trucks on Willow St., from Orange Ave. to Atlantic Ave.
AND on Willow St., from Atlantic Ave. to Pine

Tuesday, January 25th- Survey trucks on Redondo Ave., from Spring St. to Willow St.
AND on Willow St., from Redondo Ave. to Temple Ave.

Wednesday, January 26th- Survey trucks on Willow St., from Clark Ave. to Redondo Ave.

Thursday, January 27th- Survey trucks on Spring St., from Clark Ave. to Redondo Ave.

Friday, January 28th- Survey trucks on Spring St., from Redondo Ave. to Temple
AND on Cherry Ave., from Spring St. to North of Wardlow Rd.


More of the project schedule TBA